Project
PwC Luxembourg Headquarters / Cloche d’Or
Roof on forecourt with retention and deferred flow.

The project
At the PwC headquarters in Luxembourg’s Cloche d’Or district, this reference concerns a forecourt roof with water retention and delayed discharge. The aim is to coordinate use of the finished surface with water management beneath the paving, taking account of building connections and pedestrian routes.
The new construction views show preparation of the outdoor works along the façades and the drainage interfaces before finishing. They complement the overall views by making the construction process and the position of technical components within the forecourt easier to understand.
In this type of arrangement, hydraulic operation needs to be considered alongside levels, loads and maintenance access. Temporary storage and delayed discharge require project-specific sizing; they should not be confused with simply draining surface runoff away as quickly as possible.
Let’s discuss your projectProject gallery




