← All projects

Project

LTS Building 2 (Strassen)

Biosolar roof and rainwater recovery.

LTS Building 2 (Strassen)

The project

The LTS 2 building in Strassen is presented as a biosolar-roof reference. Its principle is to combine a photovoltaic installation and a green-roof build-up on the same roof. Stormwater management forms part of the overall design without this reference being classified as a retention roof.

The gallery pairs the roof layout with a detail of the Solar FKD frame. This helps explain how the panels are arranged above the vegetation, as well as the space needed for access, maintenance and plant growth.

Biosolar design involves solar layout planning, loads, ballast and the installation requirements of the selected system. Interactions between energy generation and vegetation depend on the actual configuration; no building-specific increase in energy yield is claimed here.

Let’s discuss your project

Privacy and cookies

No audience measurement tool or advertising tracker is activated on this version of the site.

Google Calendar reservation, when available, opens only at your request. The Google booking calendar is loaded only after you click on “Choose a slot”.

The Contact form forwards your request to our server to send it to us by email. Training requests are still prepared in your email.

Consult notices and confidentiality